• English
    • Latviešu
    • Deutsch
    • русский
  • Help
  • Deutsch 
    • English
    • Latviešu
    • Deutsch
    • русский
  • Einloggen
Dokumentanzeige 
  •   DSpace Startseite
  • B4 – LU fakultātes / Faculties of the UL
  • A -- Ekonomikas un sociālo zinātņu fakultāte / Faculty of Economics and Social Sciences
  • Bakalaura un maģistra darbi (BVEF) / Bachelor's and Master's theses
  • Dokumentanzeige
  •   DSpace Startseite
  • B4 – LU fakultātes / Faculties of the UL
  • A -- Ekonomikas un sociālo zinātņu fakultāte / Faculty of Economics and Social Sciences
  • Bakalaura un maģistra darbi (BVEF) / Bachelor's and Master's theses
  • Dokumentanzeige
JavaScript is disabled for your browser. Some features of this site may not work without it.

Engures un Mērsraga elektroapgādes uzlabošanas risinājuma piedāvājums

Thumbnail
Öffnen
303-47232-Gangitis_Gatis_gg13012.pdf (3.137Mb)
Autor
Gaņģītis, Gatis
Co-author
Latvijas Universitāte. Ekonomikas un vadības fakultāte
Advisor
Āboltiņa, Daiga
Datum
2015
Metadata
Zur Langanzeige
Zusammenfassung
Maģistra darba „Engures un Mērsraga elektroapgādes uzlabošanas risinājuma piedāvājums” mērķis ir veicināt kvalitatīvas elektroapgādes pieejamību Engures un Mērsraga novados. Novadu elektroapgādes problēmu apzināšanai un attīstības iespēju noteikšanai veikta ekspertu aptauja un pētījums par elektroapgādes esošo stāvokli, analizēta nepieciešamība pēc papildus elektriskajām jaudām. Kā pamatproblēma darbā noteikta: Engures un Mērsraga attīstību kavē kvalitatīvas elektroapgādes pieejamība, un konkrētā problēma: Slodzes centrā nav pietiekams elektrisko jaudu nodrošinājums. Realizējot projektu, slodzes centrā tiks izbūvēta augstsprieguma apakšstacija, kas uzlabos kvalitatīvas elektroapgādes pieejamību, tādējādi veicinot novadu izaugsmi un attīstību. Darba apjoms ir 83 lpp., kas sastāv no 3 nodaļām. Darbā iekļauti 18 attēli, 12 tabulas un 51 literatūras avots.
 
The aim of Master's Thesis “Solution Proposal for power supply improvement in Engure and Mersrags” is to develop solution for power supply improvements in Engure and Mersrags. To identify existing problems and to define opportunities for development, the author has conducted expert survey and research about current status of power supply in Engure and Mersrags, has analyzed the need for additional electrical power. The Master’s Theses addresses the main problem: lack of available high-quality power supply hinder development in Engure and Mersrags. That concludes to the concrete problem: the load center has not enough electrical power capacities. After project realization there will be constructed high-voltage substation in Engure and Mersrags load center, what will promote regional growth and development. The Master’s Thesis consists of 83 pages, containing of 3 parts of findings. The Thesis contains 18 pictures, 12 tables and 51 bibliography resources.
 
URI
https://dspace.lu.lv/dspace/handle/7/28715
Collections
  • Bakalaura un maģistra darbi (BVEF) / Bachelor's and Master's theses [8528]

University of Latvia
Kontakt | Feedback abschicken
Theme by 
@mire NV
 

 

Stöbern

Gesamter BestandBereiche & SammlungenErscheinungsdatumAutorenTitelnSchlagwortenDiese SammlungErscheinungsdatumAutorenTitelnSchlagworten

Mein Benutzerkonto

Einloggen

Statistik

Benutzungsstatistik

University of Latvia
Kontakt | Feedback abschicken
Theme by 
@mire NV