• English
    • Latviešu
    • Deutsch
    • русский
  • Help
  • Latviešu 
    • English
    • Latviešu
    • Deutsch
    • русский
  • Login
View Item 
  •   DSpace Home
  • B4 – LU fakultātes / Faculties of the UL
  • A -- Humanitāro zinātņu fakultāte / Faculty of Humanities
  • 1 -- Bakalaura un maģistra darbi (HZF) / Bachelor's and Master's theses
  • View Item
  •   DSpace Home
  • B4 – LU fakultātes / Faculties of the UL
  • A -- Humanitāro zinātņu fakultāte / Faculty of Humanities
  • 1 -- Bakalaura un maģistra darbi (HZF) / Bachelor's and Master's theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Savienojamības Problēmas Baltijas Jūras Reģionā. Fehmarn Belt Fixed Link Project un Øresund Bridge Gadījums

Thumbnail
View/Open
306-84682-Borovskaya_Maria_mb19102.pdf (1.469Mb)
Author
Borovskaya, Maria
Co-author
Latvijas Universitāte. Humanitāro zinātņu fakultāte
Advisor
Krišjāne, Zaiga
Date
2021
Metadata
Show full item record
Abstract
Darbā tiek pētītas savienojamības problēmas Baltijas jūras reģionā, analizējot Fehmarn Belt Fixed Link un Øresund Bridge gadījumus. Savienojamības attīstība ir atkarīga no transporta koridoru harmonizācijas, modernizācijas un perspektīvas. Pētījums mērķis ir vērsts uz Fehmarn Belt Fixed Link ietekmes noteikšanu savienojuma elementiem. Izmantojot salīdzinošo metodi, tiek analizēti Øresund Bridge projekts un gaidāmā projekta kvalitatīvā SWOT analīze. Tiek pētīti Eiropas Savienības instrumenti, piemēram, Trans European Transport Network un Interreg, tādu reģionu savienojamībai kā Øresund, Skåne, Schleswig-Holstein un Zealand, transporta projektu rezultāti, termiņi un prognozes. Pētījums norāda uz savienojamības problēmām Baltijas reģionā un sniedz ieteikumus šķēršļu novēršanai Fehmarn Belt Fixed Link ietvaros. Transporta infrastruktūras projekti ietekmē makroreģionālo savienojumu attīstību, pārrobežu integrāciju un transporta tīklu modernizāciju Baltijas jūras reģionā.
 
The Thesis investigates the connectivity challenges in the Baltic Sea Region by analysing the Fehmarn Belt Fixed Link and the Øresund Bridge cases. The connectivity development depends on the transport links harmonization, modernization and prosperity. The study aims to designate the Fehmarn Belt Fixed Link impact on the connectivity elements by applying the comparison approach with the Øresund Bridge Project and qualitative SWOT analysis of the forthcoming project. The European Union instruments, such as the Trans European Transport Network and Interreg, connectivity elements of the Øresund, Skåne, Schleswig-Holstein and Zealand regions and transport projects’ performance, timelines and forecasts are investigated. The study indicates connectivity challenges in the Baltic Sea Region and recommends the approaches to address the barriers within the Fehmarn Belt Fixed Link project scope. The transport infrastructure projects impact macro-regional connectivity development, cross-border integration and modernization of the transport networks in the Baltic Sea Region.
 
URI
https://dspace.lu.lv/dspace/handle/7/56636
Collections
  • 1 -- Bakalaura un maģistra darbi (HZF) / Bachelor's and Master's theses [6057]

University of Latvia
Contact Us | Send Feedback
Theme by 
@mire NV
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

View Usage Statistics

University of Latvia
Contact Us | Send Feedback
Theme by 
@mire NV